Case Studies

Our members are involved in a wide range of built environment projects and product innovations.  Our case study library is a snap-shot of our member’s achievements.

RUH Bath Pharmacy

The Pharmacy is a central part of the Trust’s services, providing drug treatments for wards and outpatient departments, and continuing care on discharge. The redevelopment of the Pharmacy is a key enabler in the delivery of the Trust’s estate strategy. The existing pharmacy building was in poor condition and as a result, the service was not compliant with European Good Manufacturing Practice or Medicines Healthcare Products Regulatory Agency standards.

Read more
 

Bristol City Hall

City Hall, Bristol is a Grade II* building commissioned by Bristol City Council as its corporate HQ in the 1930‟s.
It has been comprehensively remodelled internally to create a contemporary and agile working environment for

staff and partner organisations with increased public access.

Read more

 

Beer Wall Flood Alleviation

The A372 is a strategically important part of the Somerset highways network, acting as the main route between the areas of Langport, Yeovil and the A303. Drainage capacity through Beer Wall was restricted in the original Sowy River and Langacre Rhyne culverts under the A372, causing Beer Wall to impound water during high flows.

Read more
 

Bristol Business School

ISG was appointed on a £40m contract to construct the new Bristol Business School for UWE Bristol. ISG delivered this project to the level 2 BIM principles set out by the UK Government.
 

Cheltenham Races

The re-development of Cheltenham Racecourse was a complex scheme which presented numerous challenges, including a capped project cost, short programme, connection to existing buildings and the logistical issues presented by programming the works around a calendar of events and day-to-day operations.

Read more
 

Cannington Court

In 2011 EDF Energy selected Cannington Court in North Somerset to be their new UK training campus. The group of seven buildings had been previously used as an agricultural college by Somerset Council (Bridgwater College), including a Grade I listed domed chapel dating from 1830.  

Read more

 

St John's Hall

The Grade II Listed St John’s Hall has been an iconic structure in Penzance for hundreds of years. When the imposingmbuilding needed revitalising, Midas Construction undertook an innovative renovation project to safeguard the hall and its historical contents.

Read more
 

Green Build Hub

The ERDF funded Green Build Hub (GBH) is the brainchild of Cornwall Sustainable Buildings Trust (CSBT) and was designed, procured and built as an exemplar sustainable building. GBH is a ‘living laboratory’ where eco-building products will be installed, tested and monitored in a real-life setting.

Read more
 

The Drawing Studio

The Drawing Studio at Arts University Bournemouth was a new addition to campus, designed by renowned architect Sir Peter Cook RA and his office CRAB studio.

Read more 

 

Truro Western Corridor

Threemilestone (TMS) roundabout was a pinch point that was exasperated by buses having to negotiate it twice in order to serve the local village. By adding extra lanes on the approach to the roundabout and creating a bus gate to the east of the village buses have a more direct route making the service more attractive & relieving congestion.

Read More 

 

All of our Case Studies can be downloaded and contain contact details for the relevant company that has delivered each project. However, if you would like to make an enquiry regarding a similar project to our full range of Members then why not use our Enquiry service?

 
 
Members Area
 
Join Today
Become a Constructing Excellence South West member today and take advantage of the benefits of membership.
MORE
Subscribe to our free newsletter
 
Find a member...
 
Members
Partners